Industries and crafts can be established in specially designated areas known as industrial zones, industrial-light industrial parks, and in out-of-plan areas.

The licensing process is divided into three stages:

1. Environmental licensing

2. Installation Permit. The installation permit is issued initially, allowing the company to set up equipment within the timeframe specified in the permit.

3. Operating License, in which a check of the fully installed unit, and following a certificate of suitability from the Directorate of Health or the Directorate of Rural Development (for agricultural products), the operating license is issued.

Factors for Issuing Installation and Operating Permits for Industries and Crafts

For the issuance of installation and operating permits for industries and crafts, the compilation of the application file includes the following fully developed studies:

– Topographic survey and traffic study

– Architectural studies

– Environmental study

– Electrical and mechanical engineering studies

– Fire safety study

These studies may be modified depending on the specific case.

All engineers from the above disciplines must collaborate in a coordinated manner for the optimal design and study of the building.

Procedures for Issuing Installation and Operating Permits for Industries – Crafts

Initially, the environmental study is prepared and submitted to the relevant department, where the terms are approved according to the applicable legislation, depending on the category (approval from the Directorate of Health, Urban Planning (Building Authority), etc.).

Next, a topographic study is conducted, depicting the location of the company and establishing the layout and coverage terms for the area. Subsequently, the architect and civil engineer carry out the architectural and structural design of the facilities, in conjunction with the intended use and functionality of the building and the user's preferences and requirements.

Once the facility design is complete, the electrical and mechanical engineer prepares the remaining studies regarding the building's suitability (including electrical and mechanical installations, fire safety studies, risk assessments, etc.).

At ΙΩΝΙΚΗ Engineering, the project engineer coordinates the specialized engineers and oversees the smooth progress of the application process until its completion.

Installation and operating permits

Giota Koutra
Responsible for Programming
ΙΩΝΙΚΗ Consultancy

Industries and crafts can be established in specially designated areas known as industrial zones, industrial-light industrial parks, and in out-of-plan areas.

The licensing process is divided into three stages:

1. Environmental licensing

2. Installation Permit. The installation permit is issued initially, allowing the company to set up equipment within the timeframe specified in the permit.

3. Operating License, in which a check of the fully installed unit, and following a certificate of suitability from the Directorate of Health or the Directorate of Rural Development (for agricultural products), the operating license is issued.

Factors for Issuing Installation and Operating Permits for Industries and Crafts

For the issuance of installation and operating permits for industries and crafts, the compilation of the application file includes the following fully developed studies:

– Topographic survey and traffic study

– Architectural studies

– Environmental study

– Electrical and mechanical engineering studies

– Fire safety study

These studies may be modified depending on the specific case.

All engineers from the above disciplines must collaborate in a coordinated manner for the optimal design and study of the building.

Procedures for Issuing Installation and Operating Permits for Industries – Crafts

Initially, the environmental study is prepared and submitted to the relevant department, where the terms are approved according to the applicable legislation, depending on the category (approval from the Directorate of Health, Urban Planning (Building Authority), etc.).

Next, a topographic study is conducted, depicting the location of the company and establishing the layout and coverage terms for the area. Subsequently, the architect and civil engineer carry out the architectural and structural design of the facilities, in conjunction with the intended use and functionality of the building and the user's preferences and requirements.

Once the facility design is complete, the electrical and mechanical engineer prepares the remaining studies regarding the building's suitability (including electrical and mechanical installations, fire safety studies, risk assessments, etc.).

At ΙΩΝΙΚΗ Engineering, the project engineer coordinates the specialized engineers and oversees the smooth progress of the application process until its completion.