The Traffic Connection involves the preparation and design of road studies, junction studies, and connections with properties (houses, shops, hotels, etc.), designated areas (landscapes, museums, institutions, etc.), or road networks.
Factors of Traffic Connection
The factors considered for a study are:
1) The type of installation, its size, and the traffic impacts it will cause.
2) Access management (type and number of vehicles entering the project)
3) The frontage of the area defined by a minimum distance
4) Safety measures from the competent authority in cases where the plot has a frontage on a national or provincial road or a specific distance from an intersection with the national network
Elements of the Traffic Association
he content of road studies is governed by the Guidelines for Road Works Studies of the General Secretariat for Public Works of the Ministry of Environment, Energy and Climate Change (Y.PE.CH.DE.) and by approved specifications of recognized bodies when required by the context of each contract (e.g., O.S.M.E.O)
The traffic connection study includes:
– Topographic Diagram of the area
– Study of roads and junctions, which includes the initial design of roads and bridges where necessary
– Study of signage and safety measures
– Mechanical and Lighting studies for the traffic connection
The driving force behind traffic connections is the provision of the necessary infrastructure for the economic and technical development of the project, ensuring the best and easiest service for users and the project.
- Issuance of a Deviation Approval
- Issuance of Licenses by the Development Directorate
- Implementation Studies
- Topographical Diagram
- Study of input – output
- Architectural Study
- Design of Industrial Spaces
- Photorealistic Rendering
- Axle Load Study
- Study Of Elevator
- Study of Special Networks
- Engineering study
- Study Of Thermal Insulation
- Study Of Sound Insulation
- Study of Stream Delimitation
- Study of industrial safety
- Interior Decoration
- Study Of Heating And Air Conditioning
- Supervision & maintenance of mechanical equipment
- Scheduling & costing Project
- Occupational Risk Assessment Study
- Heating Cost Allocation Study
- Issuance of Permits, Regulation of Violations
- Study of Environmental Space Design
- Building Energy Performance Study
- Static Study-Study of static adequacy
- Study of Electrical Installations
- Studies of combustible gases / natural gas
- Study of Organization and Operation of Industry
Traffic Connection Study, Approval of Access/Exit
Panagiota Kiatipi
Surveying Engineer
ΙΩΝΙΚΗ Engineering
The Traffic Connection involves the preparation and design of road studies, junction studies, and connections with properties (houses, shops, hotels, etc.), designated areas (landscapes, museums, institutions, etc.), or road networks.
Factors of Traffic Connection
The factors considered for a study are:
1) The type of installation, its size, and the traffic impacts it will cause.
2) Access management (type and number of vehicles entering the project)
3) The frontage of the area defined by a minimum distance
4) Safety measures from the competent authority in cases where the plot has a frontage on a national or provincial road or a specific distance from an intersection with the national network
Elements of the Traffic Association
he content of road studies is governed by the Guidelines for Road Works Studies of the General Secretariat for Public Works of the Ministry of Environment, Energy and Climate Change (Y.PE.CH.DE.) and by approved specifications of recognized bodies when required by the context of each contract (e.g., O.S.M.E.O)
The traffic connection study includes:
– Topographic Diagram of the area
– Study of roads and junctions, which includes the initial design of roads and bridges where necessary
– Study of signage and safety measures
– Mechanical and Lighting studies for the traffic connection
The driving force behind traffic connections is the provision of the necessary infrastructure for the economic and technical development of the project, ensuring the best and easiest service for users and the project.
- Issuance of a Deviation Approval
- Issuance of Licenses by the Development Directorate
- Implementation Studies
- Topographical Diagram
- Study of input – output
- Architectural Study
- Design of Industrial Spaces
- Photorealistic Rendering
- Axle Load Study
- Study Of Elevator
- Study of Special Networks
- Engineering study
- Study Of Thermal Insulation
- Study Of Sound Insulation
- Study of Stream Delimitation
- Study of industrial safety
- Interior Decoration
- Study Of Heating And Air Conditioning
- Supervision & maintenance of mechanical equipment
- Scheduling & costing Project
- Occupational Risk Assessment Study
- Heating Cost Allocation Study
- Issuance of Permits, Regulation of Violations
- Study of Environmental Space Design
- Building Energy Performance Study
- Static Study-Study of static adequacy
- Study of Electrical Installations
- Studies of combustible gases / natural gas
- Study of Organization and Operation of Industry